Skip to content
Mustard SeedEnglish Class

PSLE 2027 · Our app

How our AI practice app works: a walkthrough for parents

What your child actually does in our app, screen by screen: speaking out loud for the Oral, Paper 2 and Listening practice, the feedback after each attempt, and what you can see as a parent.

By Mustard Seed English Class tutorsUpdated 6 min read

A boy in a white school shirt wears headphones while working at a computer in a classroom
Photo: Ron Lach, Pexels.
On this page 7 sections

Key takeaways

  • The app covers three of the four PSLE English papers: the Oral, parts of Paper 2, and Listening Comprehension.
  • For the Oral, your child speaks out loud and gets a mark, written feedback and a model answer after each answer, with a chance to try again.
  • Paper 2 and Listening practice is marked straight away, with an explanation for each mistake.
  • You can see progress over time, a weekly goal and a summary written for parents.
  • You can start with one Oral practice and no account. A free account adds two more, plus free Paper 2 practice and the first Listening set.

What the app covers

Parents often ask what their child will actually do in our app before they sign up. This page walks through it, screen by screen, so you can judge for yourself whether it suits your child.

Part of PSLE EnglishIn the appHow it is marked
Oral (Paper 4)Reading Aloud and picture-based conversation topics, plus a mock oral in exam formatReading Aloud from the audio; conversation answers from a transcript, by AI, against our tutors’ marking guide
Paper 2Grammar, Vocabulary, and Synthesis and Transformation, at P4, P5 and P6 levelAutomatically, against answers written by our tutors
Listening (Paper 3)Recorded passages with multiple-choice questions, and a Mock LC PracticeAutomatically, against answers written by our tutors

The topics, passages, questions and model answers are all written by Mustard Seed English Class. The app does not cover Paper 1 (Writing).

Oral practice, step by step

1. Choose a topic or a mock oral

Your child picks a topic to practise, or a full mock oral in exam format: five minutes to prepare, Reading Aloud with a given situation, then a conversation about a photograph with three questions on different themes.

2. Read aloud

The passage starts with a short situation, just as in the exam. Your child reads it aloud, and the reading is assessed from the audio for accuracy, fluency, completeness and expression, out of 15.

3. Talk about the photograph

A family of four smiling inside a tent, playing a board game together
A practice photo from the app’s conversation section.

Your child sees a photograph and answers questions about it out loud, moving from the picture to their own experiences and opinions, like the real Stimulus-Based Conversation.

4. Feedback after every answer

After each answer, your child sees what they said, written tutor-style feedback, one thing to improve, and a model answer to compare. They can then try the same answer again. The first answer is the one that counts for progress; the second try is extra practice, and the improvement is shown at the end.

The model answers follow the PEEL structure we teach: a Point, an Explanation, an Example and a Link. Our debriefs of PSLE 2026 Day 1 and Day 2 show four of them, broken down step by step.

5. Results for the whole practice

App results screen: a total score out of 40, with separate marks for Reading Aloud and the conversation, and written comments
From the Mustard Seed AI oral practice app: the results screen.

At the end, your child sees a total out of 40, split into Reading Aloud (out of 15) and the conversation (out of 25).

App feedback screen: an overall performance summary with lists of strengths and areas to improve
From the Mustard Seed AI oral practice app: overall performance.

Below the scores is an overall summary: strengths, areas to improve, and a single next step, written for your child to act on.

Paper 2 practice

Your child chooses a level (P4, P5 or P6) and one of six sections: Grammar, Vocabulary, Grammar Cloze, Editing, Vocabulary Cloze, or Synthesis and Transformation (at P5 and P6). A Grammar or Vocabulary session is ten multiple-choice questions. The three cloze and editing sections are one passage each, marked 1 mark per blank or error. A Synthesis session is five questions, worth 2 marks each, where your child types the complete sentence.

App screen: the six P6 Paper 2 sections, from Grammar to Synthesis and Transformation, each with a one-line description
From the Mustard Seed practice app: choosing a Paper 2 section.

After submitting, your child sees the score and can review every answer: their choice, the correct answer and a short explanation of why. For Synthesis, where more than one answer can be right, the app shows every answer we accept. Questions are drawn from a large bank for each level, so sessions vary.

App review screen: a wrong answer, the correct answer, and a short explanation of why
From the Mustard Seed practice app: reviewing a Grammar mistake.

Paper 2 practice is free with an account; our guide to the free practice shows each section. Our guides to every Paper 2 section and to Synthesis and Transformation use examples from the same question bank.

Listening practice

Your child chooses a set and works through its passages. There are nine regular sets, each with six recordings and 20 questions, plus the Mock LC Practice. Each recording can be played at most twice, and every question has three options.

App screen: a Listening passage with a play button, the plays remaining, and three multiple-choice questions
From the Mustard Seed practice app: a Listening passage and its questions.

After submitting, your child sees the score straight away. For every question they got wrong, the app shows their answer, the correct answer and our tutor’s explanation.

App review screen: a wrong answer about the order of errands, the correct answer, and an explanation that the plan changed
From the Mustard Seed practice app: the explanation after a wrong Listening answer.

With a free account, the first Listening set is open with unlimited tries. Full access opens every set and the Mock LC Practice, which draws a new set each time. Our Listening Comprehension guide covers the habits worth practising.

What parents can see

App progress chart showing practice scores over time
From the Mustard Seed AI oral practice app: progress over time.

Every practice is logged, so you can see whether scores are trending up. On the dashboard, your child also has:

  • A weekly goal for Oral practices, with a count of weeks in a row the goal was met.
  • A focus for the week, and words to practise saying, which your child can tap to hear.
  • A message to parents: a short summary of the week that your child can send to you.
  • Levels, XP and an avatar that changes as they practise, which many children find motivating.

What is free, and what is paid

PlanWhat it includes
No accountOne Oral practice
Free accountTwo more Oral practices, Paper 2 practice, and the first Listening set with unlimited tries
Monthly, S$19.90All Oral topics with no cap on attempts, the mock oral, every Listening set and progress tracking. Renews monthly; cancel any time
1 month, S$19.90 onceThe same, for 30 days, with no renewal
Exam Pass, S$59.90 onceThe same, valid until 31 October 2027, with no renewal

Paper 2 practice stays free on every plan. Practice marks are guidance, not official PSLE marks. Full plan details are on our AI oral practice page.

Questions parents ask

Is the AI marking the same as PSLE marking?

No. Practice marks are guidance to show progress and what to work on, not official PSLE marks. Our marking follows the same areas the Oral rewards, and the feedback is designed to be acted on.

What does my child need?

A device with a microphone and a quiet room. The app runs in the browser and works best in Chrome or Edge. Headphones help for Listening practice.

Are recordings stored?

For Reading Aloud, the audio is sent for pronunciation analysis and is not stored afterwards. For the conversation, the app works from a transcript of what your child said. Our privacy policy has the details.

Does the app replace a tutor?

It does a different job. The app gives plenty of practice with instant feedback. A tutor can diagnose what is holding a child back and adapt to them. Our honest guide to coaching helps you decide what your child needs.

Mustard Seed is an independent tuition provider and is not affiliated with or endorsed by SEAB, MOE or Cambridge Assessment. No tutor can guarantee a particular grade.